2023 – I PRIZE

ARX wins the first prize for the award of the integrated design contract, the coordination of safety in the planning phase and the implementation of the works of the new Casa Comunale in the Municipality of San Cascino in Val di Pesa, with Consorzio GST Appalti e Costruzioni.

The project involves the construction of the new municipal building in the basement of the car park called “Ex Stianti”, which will incorporate a series of services currently located in separate locations and then is an opportunity for a general reorganization of municipal activities. The building, which will occupy a building area of 1800 mq, will then be built in elevation of 3 levels, from the plan of cover of the north-east wing of the current building intended for public parking with access from viale Terracini and to the side of the retaining wall of viale Corsini. […] […]


close

WIN

2023 – I PRIZE

ARX wins first prize for the final and executive design of the new Casa Comunale in the Municipality of San Casciano in Val di Pesa […]

https://www.arxnet.net/win/CasaComunale

close

RiFonderia

Urban, architectural and social regeneration

close

Location
Prato, Italy
Client
Municipality of Prato
Date
2022
Dimensions
2.473 mq
Budget
€ 4.173.695,00
Commission
Competition
Architectural design
Arx srl

The Ri-Fonderia project stems from a solid initial impulse, which was at the basis of the entire design process, to rewire the building architecturally and socially, re-inserting it into a broader virtuous system present in the dynamics of the Prato system. The complex is thus re-located in the urban relational system of the historic centre, of which it has always been a part, increasing its direct relations with the public and relational spaces of its neighbouring context. One of the fundamental aspects of the architectural proposal lies in the Re-designing and implementation of the spatial and functional relations of the building about the surrounding social fabric, resolving the degradation in the urban area.

From the housing point of view, the first floor, currently characterised by 8 dwellings, has been upgraded both architecturally and from a technological and energy point of view, increasing the offer of public residence housing to 12, divided into 6 Small Lodgings; 4 Medium Lodgings; 2 Large Lodgings.